The Process

 
   
  The Investment Casting Process commences with the production of High Quality Wax Patterns from Aluminium Injection Tooling. These are then mounted onto a wax runner system and the assembled mould is coated several times with ceramic material and air-dried.

 
 
     
   
  On completion, the mould is de-waxed leaving an empty shell which is subsequently fired and filled with molten metal. The shell is then allowed to cool and removed.
 
 

 

 
 
 
 
 
   
  Castings are cut from the riser/runner system, linished, heat treated (when required), sand blasted and passed through to quality control for a rigid Inspection Programme.  
 
 
 
 
     
 
 
     
 

Faro Arm Inspection

 
   
  Advanced casting inspection department now has the option of a portable Faro Arm, to perform a high level of accuracy product measurement and perform CAD-To-Part analysis in any environment, with an 8ft volumetric accuracy of upto +/-.0007" (+/- 18 microns)  
     
   
  Significant financial investment has provided customers with state-of-the-art plant, process and quality control technology, which through a continual upgrade policy ensures Advanced Castings Company remains at the fore-front of Investment Castings Technology.