|
|
The Process
The
Investment Casting Process commences with the production of High Quality
Wax Patterns from Aluminium Injection Tooling. These are then mounted onto
a wax runner system and the assembled mould is coated several times with
ceramic material and air-dried.
On
completion, the mould is de-waxed leaving an empty shell which is
subsequently fired and filled with molten metal. The shell is then allowed
to cool and removed. Castings are cut from the riser/runner system,
linished, heat treated (when required), straightened, sand blasted and
passed through to quality control for a rigid Inspection
Programme.
Significant financial investment
has provided customers with state-of-the-art plant, process and quality
control technology, which through a continual upgrade policy ensures
Advanced Castings Company remains at the fore-front of Investment Castings
Technology.
| |
Foundry Fire Pre-heat Furnace

Induction melting Unit

|